DST Assurance Program™: Real Business Examples, Real Savings
Businesses currently enrolled in the DST Assurance Program™ are realizing high ROIs by making appropriate decisions based upon the service’s findings. Below are real examples.
Finding: Large air leak on air drying unit filter
Result: Repair inexpensively made, saving excess energy and operating costs
Finding: Bent shaft in a large water cooling pump installed in a new hi-rise building
Result: Repair made at no cost under warranty that was set to expire in two months
Finding: Numerous air leaks in a pneumatic control system that caused other systems to work harder than needed to compensate
Result: Repair made at a minimal cost, saving more in energy loss dollars
Finding: High load and wear levels on bearings and couplings within a large water cooling pump
Result: Repair was planned and budgeted as a redundant pump was available
Finding: Significant phase imbalance and loading stress on a multi-floor transformer
Result: Cooling applied immediately to prevent damage from overheating, repair planned and budgeted as a non-emergency
Finding: Misalignment of a newly repaired water cooling pump, causing significant wear to couplings and bearings
Result: Repair made by company originally performing service within a window where rate was still negotiable
Finding: Persistent leak in exterior window that previous repairs did not stop
Result: Repairs made at minimal cost once exact leak location was identified
Finding: Major motor winding damage in a central cooling pump motor during due diligence phase of pre-purchase inspection
Result: Information used by buyer for budgeting, contingency funding, and planning repairs